A curved brick retaining wall with steps up to a front walk, one of our jobs

How to Tell
a Retaining Wall
Was Built to Last

You can't see the most important parts of a finished wall. Here is how to judge one anyway, whether you're checking a builder's work or your own backyard.

By Gary, owner, Ozarks Custom Hardscaping. Sparta, MO. September 17, 2026.

Segmental block retaining wall along a driveway with steps built into the corner
Segmental block wall along a driveway, steps built into the corner. One of our jobs.

1. The Courses Are Level, Every One of Them

Stand at the end of the wall and sight down it like a rifle barrel. Every course should run straight and level. A wavy course usually means the base under that section wasn't compacted evenly, or the ground under it settled. Watch that section first.

2. The Wall Leans Into the Hill

Builders call it batter. Most segmental block systems step back about three quarters of an inch to an inch per course, which adds up to an inch or more for every foot of height. A few block systems are engineered to stand near plumb with reinforcement behind them, so the check is whether the wall leans the way its block system is designed to. A wall that has tipped past plumb and leans outward is moving, and it will not move back on its own.

3. There Is Somewhere for Water to Go

Water is what pushes walls over. Behind a properly built wall there is clean gravel, and at the bottom of that gravel a drain line that daylights or ties into a buried drain. Ask where it goes. Water with no way out sits behind the wall, and every freeze pushes harder on the wall.

4. The First Course Should Be Buried

The first course of a well-built wall sits below grade on compacted gravel, at least 6 inches down and deeper where the ground in front slopes away. If you can see the bottom of the bottom block, the wall is sitting on top of the ground with nothing holding its toe in place.

5. Water Is Not Coming Through the Face, Year After Year

Block weeps, and a shaded face can stay damp for days, so a wet face by itself doesn't tell you much. Neither does water standing along the base after a storm; that can just mean the ground in front is flat. Look at the wall two or three days after a hard rain. A white crust of efflorescence spreading across the same courses year after year means water is pushing through the block from behind instead of draining out the bottom.

Retaining wall with steps and built-in lighting at dusk
Lighting set into the wall itself, with the steps tied into the courses. Another of ours.

6. Steps and Lighting Require Advance Planning

Look for steps that tie into the wall structure and caps that are glued down straight, and for lighting recessed into the courses. Steps have to be planned in with the courses. Under-cap lights can be added to a finished wall, with more work to hide the wire. Lights recessed into the courses have to go in as the wall is built.

What to Ask Before Anyone Builds Yours

How deep is the base, and what goes in it? What goes behind the wall, and where does the water come out? You want to hear specifics: compacted gravel, a drain line, and where that line ends up.

Contact Us for All Your Hardscaping Needs.

Guaranteed. If there's a problem with the work, call and Gary will fix it.

Get an Estimate.

Call (417) 861-3462, or send the details here.

Monday to Saturday, 7am to 7pm.

NCMA certified · Licensed and insured

Guaranteed. If there's a problem with the work, call and Gary will fix it.